Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the fakerpress domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/langstoneconstruction.co.uk/httpdocs/wp-includes/functions.php on line 6114
Raglan CiW VC Primary School - Langstone Construction Group

Langstone Construction are hiring – more

Client: Monmouthshire Council Duration: June 2014 - August 2015 Cost: £4.5m Procurement: JCT Design & Build procured through the SEWSCAP framework Designers: Boyes Rees Architects.

Raglan CiW VC Primary School

Project Description

Client: Monmouthshire Council Duration: June 2014 - August 2015 Cost: £4.5m Procurement: JCT Design & Build procured through the SEWSCAP framework Designers: Boyes Rees Architects.

Raglan CiW Primary School was procured through the SEWSCAP framework to meet the 21st Century New Schools programme and built for integrated learning experiences. The project consisted of the design and construction of a new primary school to replace the existing school in Raglan, which was well-needed.

Situated on an adjacent parcel of land the project comprised the construction of a single-storey steel-framed building.

New grass playing field, hard surface MUGA and external play areas, amphibian area and wildflower garden, staff & visitor parking space and bus pull-in areas. The new school featured innovative teaching practices with plazas, and large open-space classrooms, which include two year-groups of 60 children with large bi-fold doors allowing the outside to come inside and provide additional external teaching space.